kpw 125 Manuale-dofficina : Pagina 109

Microfiches
Image preview

Pagina 107

Image preview

Pagina 108

Image preview

Pagina 110

Image preview

Pagina 111

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190
          10.CRANKCASE/CRANKSHAFT/KICK
     STARTER/TRANSMISSION                                                      K-PIPE 125
                                                         Dowel Pins
 CRANKCASE INSTALLATION
 Install the dowel pins and a new gasket onto
 the left crankcase.




                                                                      Gasket

                                                                  Bolts
 Install the right crankcase over the left
 crankcase.

     Make sure that the gasket stays in place.

 Install and tighten the crankcase bolts
 securely in a crisscross pattern in 2-3 steps.




 Install the return spring and spring retainer               Spring
 onto the kick starter spindle.
 Install the snap ring.
 Refer to the sections on page 10-4 for
 installation of the removed parts.




                                                  Retainer               Snap Ring




                                                                                     10-12