kpw 125 Manuale-dofficina : Pagina 102

Microfiches
Image preview

Pagina 100

Image preview

Pagina 101

Image preview

Pagina 103

Image preview

Pagina 104

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190
          10. CRANKCASE/CRANKSHAFT/KICK
     STARTER/TRANSMISSION                                                K-PIPE 125

                                                  Kick Starter Spindle   Crankshaft
 CRANKSHAFT/KICK STARTER
 REMOVAL
 Remove the crankshaft.
 Remove the kick starter spindle.




 CRANKSHAFT
 INSPECTION
 Measure the connecting rod big end side
 clearance.
 Service Limit: 0.80mm replace if over




 Measure the connecting rod big end radial
 clearance at two points at right angles to the
 shaft.
 Service Limit: 0.05mm replace if over




 Measure the crankshaft runout.
 Service Limit: 0.1mm replace if over




                                                                            B
                                                           A




10-5