kpw 125 Manuale-dofficina : Pagina 96

Microfiches
Image preview

Pagina 94

Image preview

Pagina 95

Image preview

Pagina 97

Image preview

Pagina 98

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190
          9. CLUTCH/GEAR SHIFT MECHANISM                                                 K-PIPE 125


 Install the gear shift spindle and washer.         Gear Shift Spindle
 During installation, make sure that the return
 spring aligns with the crankcase tab.




                                                                         Spring
 RIGHT CRANKCASE COVER                                                   Adjusting Bolt
 INSTALLATION
 Install the new O-ring and lock nut.




                                                  Lock Nut                            O-ring

 Install the dowel pin and a new gasket.                     Gasket




                                                     Dowel Pins
 Install the right crankcase cover and tighten                Bolts
 the cover bolts.
 Install the kick-starter pedal.
 Adjust the clutch (page 2-8).




                                                                                   9-12