kpw 125 Manuale-dofficina : Pagina 56

Microfiches
Image preview

Pagina 54

Image preview

Pagina 55

Image preview

Pagina 57

Image preview

Pagina 58

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190
          5. ENGINE REMOVAL/INSTALLATION                                              K-PIPE 125



 Remove the gear shift lever bolt and gear
 shaft lever.
 Remove the two bolts attaching the left rear
 crankcase cover and remove the rear
 crankcase cover.




                                                            Rear crankcase cover   Bolt

 Remove the two bolts attaching the drive                      Set Plate   Drive Chain
 gear set plate and the set plate.
 Remove the drive gear and chain.
 Remove the engine hanger nuts and pull out
 the engine hanger bolts.
 Remove the engine.




 ENGINE INSTALLATION                                Bolts                    Drive Gear
 Install the engine in the reverse order of
 removal.
 Install the engine to its original position with
 a jack or other adjustable support.
 · When        installing the engine, do not
      damage the bolt threads and route the
      wires and cables properly.
    · Install the gear shift pedal by aligning
      the punch mark on the pedal with that
      on the spindle.
    · Fill the crankcase to the proper level
      with the recommended engine oil.
    · After installation, perform the following
      inspections and adjustments:
      1. Throttle operation
      2. Clutch lever free play adjustment
      3. Drive chain adjustment




5-3