kpw 125 Manuale-dofficina : Pagina 116

Microfiches
Image preview

Pagina 114

Image preview

Pagina 115

Image preview

Pagina 117

Image preview

Pagina 118

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190
          11. FRONT WHEEL/SUSPENSION/
    STEERING                                                                 K-PIPE 125

                                                           Nut                      Bolt

 Remove the handlebar lock nut to remove
 the handlebar.




                                                                 Handlebar

 INSTALLATION                                              Tab/Groove
 Install the handlebar, aligning the tabs of the
 handlebar with the grooves in the steering
 stem.
 Install and tighten the handlebar lock nut.
 Torque: 4.5~5.0kg-m




                                                                         Hole
 When installing the cover up throttle
 housings, the pin on the housing with the
 hole in the handlebar. Tighten the two switch
 housing screws.




                                                                             Pin
                                                   Bolts                     Hole
 When installing the master cylinder align the
 tab on the holder with the hole in the
 handlebar with the holder "UP" mark facing
 up.
 First tighten the upper bolt and then the
 lower bolt.
 Torque: 1.01.4kg-m




                                                                     "UP" Mark

11-5