8. CYLINDER HEAD/VALVES                                                                     UXV 500




 Apply engine oil to cylinder head bolt (No.
 1 ­ 8) threads.

 Install the four bolts (No. 5 ­ 8).
 Install the four bolts/washers (No. 1 ­ 4).
 Tighten the holder bolts (No. 1 ­ 9) in a
 crisscross pattern in five steps to the specified
 torque as follow diagram.



                                Tighten the bolts to the specified torque in sequence
                                                 kgf-m (N-m, lbf-ft)
                         (1)         (2)     (3)     (4)       (5)        (6)   (7)   (8)    (9)

           Step 1    2.4 (24, 17)                          1.2 (12, 9)                       

           Step 2    3.8 (38, 27)                          2.3 (23, 17)                      

           Step 3    4.8 (48, 35)                    




                                                                                            8-20