grand dink 125 mmc 1 Manuale-dofficina : Pagina 192

Microfiches
Image preview

Pagina 190

Image preview

Pagina 191

Image preview

Pagina 193

Image preview

Pagina 194

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 249
          14.STEERING HANDLEBAR/FRONT WHEEL/FRONT
   BRAKE/FRONT SHOCK ABSORBER/FRONT FORKGRAND DINK 125/150

                                                    Throttle Grip     Throttle Cable
 Lubricate the throttle grip front end with
 grease and then install the throttle grip.
 Connect the throttle cable to the throttle grip.
 Install the right and left handlebar switches
 and tighten the screws.

 · Adjust the throttle grip free play to the
     specified range of 26mm.




                                                            Brake Master Cylinder
 Install the front and rear brake master
 cylinders.
 · Install the brake master cylinders by
     aligning the index marks.




                                                                      Bolt

 FRONT WHEEL
 REMOVAL
 Jack the motorcycle front wheel off the
 ground.
 Remove the front axle nut to pull out the axle.
 Remove the front wheel and the speedometer
 gear unit.



                                                    Axle Nut         Speedometer Gear Unit

 INSPECTION
 AXLE RUNOUT
 Set the axle in V blocks and measure the
 runout using a dial gauge.
 The actual runout is  of the total indicator
 reading.
 Service Limit: 0.2mm replace if over




14-5